PHASE TWO EXPANSION · COUNTY MEETING-READING ENGINE
Same AI Pipeline Pointed at 3,100 Counties: Data Center, Solar & BESS Permitting
Once the FDA Triage → Extract → Entity Match → Score pipeline is running, Phase Two points the exact same architecture at county planning agendas, hearing packets, zoning ordinances, moratoria, and ISO/RTO interconnection queues (2,061 GW active).
3,100 × 4
County × Asset Type Pages (~12.4K)
40,000+
ISO/RTO Queue Project Pages
$299–$999/mo
County Alert & Parcel Overlay SaaS
$25K–$60K/yr
Energy Developer Team / API Tier
Live County Permitting & Queue Survival Preview Nodes
Hyperscale Data Center & Substation
Loudoun County, VA
64%
Queue Survival Probability
Ordinance Status: Conditional Special Exception Required (2025 Zoning Amendment)
Active Moratoria: None Active — Stricter Noise & Backup Generator Tier-4 Rules
Interconnection Queue: 4.8 GW across 19 PJM Interconnection Queue projects
Hearing Opposition Signal: Elevated HOA opposition near residential buffers; industrial corridors approved
Utility-Scale Solar + BESS (Battery Energy Storage)
Williamson & Bell Counties, TX
78%
Queue Survival Probability
Ordinance Status: Permitted by Right (Unincorporated County — Chapter 312 Tax Abatement Scrutiny)
Active Moratoria: No Moratorium — Fire Marshal NFPA 855 BESS spacing required
Interconnection Queue: 6.2 GW across 28 ERCOT GIS Queue projects
Hearing Opposition Signal: Low permitting friction; transmission congestion at Oncor 345kV node
Hyperscale Data Center, Solar & BESS
Maricopa & Pinal Counties, AZ
71%
Queue Survival Probability
Ordinance Status: Industrial I-1/I-2 Special Use Permit + Water Allocation Review
Active Moratoria: Targeted groundwater review for evaporative cooling; closed-loop chillers fast-tracked
Interconnection Queue: 5.4 GW across WECC / APS / SRP queues
Hearing Opposition Signal: Moderate water-use scrutiny; high approval rate for closed-loop cooling designs
Data Center Campus & Utility Solar (SB 52 Regime)
Franklin & Licking Counties, OH
82%
Queue Survival Probability
Ordinance Status: Ohio SB 52 County Commissioner Exclusion Zone Check Required for Solar
Active Moratoria: 9 townships have SB 52 utility-solar restrictions; Data Centers aggressively incentivized
Interconnection Queue: 3.9 GW across PJM Queue
Hearing Opposition Signal: High solar opposition in rural townships; strong tax-abatement support for data centers